Confidential Client - Water Withdrawal

Confidential Client

Freshwater Withdrawal Station


 ARM EnerTech Associates (AETA) and ARM, was awarded a design bid proposal by a confidential client to design and construct a surface water withdrawal in Sullivan County, PA. Currently, there are no other active, large-volume water sources located in the vicinity of the client’s leased acreage. 

 

The project was originally developed as a single phase project, but was later divided into two phases (Phase I and II). Phase I was recently completed with Phase II proposed to be completed in 2017. Phase I entailed installation of a 870-foot long 12-inch diameter high-density polyethylene pipe (HDPE) freshwater withdrawal pipeline, intake pumps piping and valves, and the electrical infrastructure to monitor and record withdrawal data and pump performance. Pipeline excavation and installation was completed by Keystone Clearwater Solutions.

 

For Phase I, freshwater will be stored in temporary tanks. Phase II will see the installation of two one-million gallon above ground freshwater storage tanks.

 

AETA provided the electrical design and installation of the system which included the development of monitoring software and a visual interface for flow monitoring and pump control. Phase II will include the additional electrical work to install the remaining components for the load-out pumps for a six (6) bay truck distribution facility, and recirculation pumps for temperature control at the proposed storage tanks.

 

Additionally, AETA prepared and developed the Susquehanna River Basin Commission permit application and metering plan required for the withdrawal, and prepared and submitted the Pennsylvania Department of Environmental Protection Joint Permit Application for the installation of the buried intake line and intake screen.

 

water withdraw

Project Highlights

  • Developed as a single phase project, but was later divided into two phases (Phase I and II)
  • Installation of a 870-foot long 12-inch diameter high-density polyethylene pipe (HDPE) freshwater withdrawal pipeline
  • Installation of intake pumps piping and valves, and the electrical infrastructure to monitor and record withdrawal data and pump performance.
  • Electrical work to install the remaining components for the load-out pumps for a six (6) bay truck distribution facility, and recirculation pumps for temperature control at the proposed storage tanks.
  • Preparation and development of the Susquehanna River Basin Commission permit application and metering plan required for the withdrawal.